1、 Name and summary of construction project:
Our company plans to invest 100 million yuan to build a technical transformation project with an annual output of 3000 tons of 1,2-pentanediol in the existing plant area of Loucun fine chemical new material industry cluster area, Xinxiang City, Henan Province. Dismantle the existing triethylenediamine production unit, build a 3000t / a1,2-pentanediol production line in the workshop, and produce aluminum hydroxide powder catalyst in the catalyst workshop for other products. The total construction area of the project is 4000 square meters, mainly including production workshop, rectification tower area, warehouse, raw material storage area, etc. 1,2-pentanediol is obtained by catalytic reaction and alcoholysis with n-pentane as raw material and hydrogen peroxide as oxidant. The project was filed with the development and Reform Commission of Huojia County on June 7, 2021 (project code: 2106-410724-04-01-532557). The project complies with the national industrial policy; In line with the land use planning of the park and the planning EIA and access conditions.
2、 Construction project unit and contact information
1. Employer: Xinxiang Jujing Chemical Co., Ltd
2. Contact: Minister Wang
3. Contact information: Tel: 13462296373
3、 Name and contact information of the EIA institution undertaking the project
1. Name of EIA institution undertaking the project: Henan Chemical Research Institute Co., Ltd
2. Contact: Fu Gong
3. Contact information: Tel: 0371-67712661;
4、 Procedures and main contents of environmental impact assessment
The construction party entrusts the EIA unit to carry out the EIA. After accepting the entrustment, the EIA unit shall organize * * technicians to conduct field survey on the site and formulate a work plan on the basis of investigation, collection and analysis of data; Investigate regional environmental status and pollution sources; Analyze the main pollution factors of the project; Predict the impact of pollutants on the local environment; Put forward environmental protection measures and conduct economic feasibility demonstration; Analyze the environmental risks of the project and put forward risk prevention measures; Give the pollutant discharge list and clarify the environmental impact assessment conclusion of the project* Final environmental impact report.
5、 Main matters for soliciting public opinions
(1) Solicit public opinions on the site selection of the project;
(2) Solicit public opinions on the environmental status of the project site;
(3) Solicit public opinions on the environmental impact of the project during construction and operation;
(4) Solicit other specific opinions of the public on the construction of the project.
6、 Main ways of public opinion
The public shall put forward specific opinions or suggestions to the construction unit and the evaluation unit in the form of real name through written opinions, e-mail, telephone, etc.